Monday, July 28, 2014

Half Way Point

Hi everybody. I apologize for the very delayed post. I was tied up with swim team and then I went on vacation. We  are now well over the half way point for the project. We have dumped the oysters into the baskets and cleaned them really well one last time and it's all downhill from here. We had a maintenance day yesterday although it wasn't the usual. It was raining pretty hard and with the possibility of thunder and lightning we only inspected and repaired the floats that needed it the most. Our next maintenance day is on August 9th at 9:00 am at the usual location. As this is one of the last oyster days we have left I encourage those who haven't had a chance to participate to come out. Thanks for the continued support!